DETAILS
-
2012/06/04
-
Implementation Status and Results Report
-
ISR6859
-
1
-
1
-
Disclosed
-
China - CN-PCF Jincheng Coal Bed Methane Project : P087291 - Implementation Status Results Report : Sequence 02
-
coal bed methane
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 84
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Peng; Ximing.
China - CN-PCF Jincheng Coal Bed Methane Project : P087291 - Implementation Status Results Report : Sequence 02 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/741511468743351008