The development objectives of the Electricity and Gas Improvement Project for Nigeria are to: (i) improve the availability and reliability of gas supply to increase power generation in existing public sector power plants; and (ii) improve the power network’s capacity and efficiency to transmit and distribute quality electricity to the consumers. Some of the negative impacts and mitigation measures include: (1) identify and confirm suitable sites for the construction camps, if any, and storage areas for materials; (2) identify disposal sites for construction waste approved by the local authority; (3) identify the excavation depth and width according to the drawing design; (4) implement preventive maintenance program for vehicles and equipment working on site and promptly repair vehicles with visible exhaust fume; (5) provide ear muffs to construction workers usually located near noisy machines; (6) the contractor should make health and safety facilities available in the project site; and (7) prevent storage of construction materials, equipment, and machineries on traffic lanes.
Details
-
Author
-
Document Date
2016/01/01
-
Document Type
Environmental Assessment
-
Report Number
SFG1848
-
Volume No
2
-
Total Volume(s)
3
-
Country
-
Region
-
Disclosure Date
2016/03/01
-
Disclosure Status
Disclosed
-
Doc Name
Environmental and social management plan for the rehabilitation/reinforcement of Sagamu (Ogun state), Awka (Anambra state), Yandev (Benue state), and Gasau (Zamfara state) 132/33kV transmission sub-stations
-
Keywords
federal law;Environmental and Social Impact Assessment;Environmental and Social Management Plan;Environmental Management and Monitoring Plan;land use act;social and economic development;health and safety issue;disposal of construction waste;electric and magnetic field;Environmental and Social Safeguard;community health and safety;Occupational health and safety;construction and operation;satellite image;negative environmental impact;host country regulation;disposal of waste;population and environment;international good practice;soak away pit;demand for electricity;asbestos-containing materials;replacement of equipment;natural disaster risk;quantity of waste;physical cultural resources;supply and installation;corporate social responsibility;law and regulation;Solid Waste Management;probability of occurrence;hand dug well;capacity of infrastructure;access to transmission;number of jobs;economic impact assessment;local government area;impact evaluation methodology;socio economic impact;court of law;environmental resource;Environmental Resources;mechanical equipment;building material;mitigation measure;national regulation;financing institution;construction site;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- DOCX
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Medani,Ogochukwu Joy
Nigeria - Electricity and Gas Improvement Project : environmental assessment (Vol. 2) : Environmental and social management plan for the rehabilitation/reinforcement of Sagamu (Ogun state), Awka (Anambra state), Yandev (Benue state), and Gasau (Zamfara state) 132/33kV transmission sub-stations (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/742611468122975436/Environmental-and-social-management-plan-for-the-rehabilitation-reinforcement-of-Sagamu-Ogun-state-Awka-Anambra-state-Yandev-Benue-state-and-Gasau-Zamfara-state-132-33kV-transmission-sub-stations