Details
-
Author
-
Document Date
2021/04/29
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR46251
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2021/04/29
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Liberia Accelerated Electricity Expansion Project (LACEEP) - P133445 - Sequence No : 13
-
Keywords
Access to Electricity; number of connections; integrated management; transmission line; distribution network; Investment Project Financing; distribution line; electricity sector; managerial capacity; storage capacity; kv substation; pumping station; operational performance; storage facility; international market; competitive basis; commercial management; storage tank; compensation payment; operation risk; risk category; household connection
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Tran,Ky Hong
Disclosable Version of the ISR - Liberia Accelerated Electricity Expansion Project (LACEEP) - P133445 - Sequence No : 13 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/743451619662908286/Disclosable-Version-of-the-ISR-Liberia-Accelerated-Electricity-Expansion-Project-LACEEP-P133445-Sequence-No-13