Doc Name
Nepal - Kali Gandaki A Hydropower Plant Rehabilitation Project (KGAHPRP) : P132289 - Implementation Status Results Report : Sequence 03
-
Keywords
Environmental and Social Safeguard;works and capacity building;Energy and Mining;risk category;Financial Management System;award of contract;operation and management;primarily due;Consulting services;performance rating;procurement action;procurement performance;environmental safeguard;water filtration;direct contracting;administrative issues;civil works;water level;safety measure;dam safety;power supply;procurement process;velocity distribution;investment loan;approved budget;initial deposit;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
0000A8056
Nepal - Kali Gandaki A Hydropower Plant Rehabilitation Project (KGAHPRP) : P132289 - Implementation Status Results Report : Sequence 03 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/744021468324571719/Nepal-Kali-Gandaki-A-Hydropower-Plant-Rehabilitation-Project-KGAHPRP-P132289-Implementation-Status-Results-Report-Sequence-03