Details
-
Author
-
Document Date
2020/06/28
-
Document Type
Environmental and Social Review Summary
-
Report Number
ESRSC01467
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/06/28
-
Disclosure Status
Disclosed
-
Doc Name
Concept Environmental and Social Review Summary (ESRS) - Comoros Inter-island Connectivity Project - P173114
-
Keywords
Environmental and Social Management Plan; Environmental and Social Review Summary; Environmental and Social Management System; Assessment and Action Plan; community health and safety; Land Acquisition and Resettlement; Occupational health and safety; health and safety risk; Environmental and Social Impact; project design and implementation; sustainable management; grievance redress mechanism; implementation of mitigation; categories of worker; social and environmental; greenhouse gas emission; community awareness raising; Poverty & Inequality; allocation of subsidy; inclusion of women; private sector partner; displacement of persons; law and regulation; maritime transport policy; union of comoros; construction and operation; safety of worker; state of emergency; safety of passenger; adverse environmental impact; dredged material; civil works; Cultural Heritage; marine habitat; construction activities; construction phase; new vessel; mitigation measure; labor influx; environmental risk; contract worker; labor requirement; boat operator; working condition; coastal livelihoods; land use; pollution control; marine biodiversity; institutional framework; air emission; construction work; stakeholder engagement; construction material; navigation aid; response procedure; emergency preparedness; managing risk; license requirement; equitable manner; local area; international consultant; coastal resource; migrant worker; Infectious Disease; irreversible impacts; human population; adverse risks; general assessment; environmental damage; organic waste; camp management; transparent manner; road safety; adversely impact; disease spread; sexual harassment; smaller port; dust suppression; vehicle maintenance; liquid waste; construction machinery; ghg emissions; corporate commitment; vehicle traffic; community access; community outreach; construction period; passenger safety; land availability; construction site; Natural Resources; terrestrial biodiversity; protection measure; in work; international waterway; private investor; borrower's commitment; project's impact; restoration plan; mitigation plans; construction contractor; small boat; Public-Private Partnership; blended finance; consultation process; coastal communities; port operation; Social Assessment; interest group; labor camp; labor issue; bonded labor; worker training; marine ecosystem; hazardous substance; temporary worker; emergency response; safety issue; environment risk; Safeguard Policies; safeguard policy; port regulation; project datum; Program of Activities; local population; security risk; ecological impact; maritime safety; formal declaration; natural disaster; transport investment; preparatory work; project costing; financial market; transport service; disposal facility; land site; critical infrastructure; coastal area; port capacity; physical characteristic; Marine Pollution; port area; community safety; environmental contaminants; hazardous cargo; improved land
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Iimi,Atsushi
Concept Environmental and Social Review Summary (ESRS) - Comoros Inter-island Connectivity Project - P173114 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/748571593373730985/Concept-Environmental-and-Social-Review-Summary-ESRS-Comoros-Inter-island-Connectivity-Project-P173114