Details
-
Author
-
Document Date
2020/11/25
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR44165
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/11/25
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Second Tamil Nadu Road Sector Project - P143751 - Sequence No : 12
-
Keywords
project road; large civil works contracts; average travel time; road safety; Investment Project Financing; construction and rehabilitation; core road network; road safety improvement; proportion of woman; improving road safety; data collection process; safety management; new contract; road condition; ppp contract; capacity enhancement; annual fatality; Road Accidents; need assessment; automated system; field staff; road system; result indicator; local area; work contracts; operation risk; risk category
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Markland,James
Disclosable Version of the ISR - Second Tamil Nadu Road Sector Project - P143751 - Sequence No : 12 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/749801606325806232/Disclosable-Version-of-the-ISR-Second-Tamil-Nadu-Road-Sector-Project-P143751-Sequence-No-12