The Second Guadalupe Hydroelectric Project covers the foreign exchange cost of the second stage project as well as foreign exchange requirements under the first stage project (See report no. TO203). The project comprises the addition of an 18 MW hydro unit in the Troneras plant, three hydro units of 40 MW each at the Guadalupe III plant, the construction of an earth fill dam, the construction of transmission facilities, and the expansion of the Medellin distribution system. The cost of the development is equivalent to $185 per kilowatt of installed capacity. The low cost of the hydro installation makes it comparable in capital cost to a thermal installation of equivalent capacity.
Details
-
Document Date
1961/05/31
-
Document Type
Memorandum & Recommendation of the President
-
Report Number
P249
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2010/06/24
-
Disclosure Status
Disclosed
-
Doc Name
Colombia - Second Guadalupe Hydroelectric Project
-
Keywords
foreign exchange;transmission and distribution;internal cash generation;sound financial position;domestic currency cost;hydro generating capacity;balance of payment;total external debt;foreign exchange expenditures;power rate;debt service;construction period;civil works;hydroelectric potential;short distance;legal authority;special interest;engineering study;long-term loan;market study;exchange earnings;foreign consultant;investment expenditure;financing arrangement;fixed asset;payment date;metropolitan area;sewerage service;market area;autonomous agency;power company;manufacturing industry;external credit;stabilization program;export earnings;power shortage;legal instrument;special care;Market Studies;hydroelectric installation;Electric Power;external indebtedness;city council;inflationary pressure;thermal plant;Fixed Assets;civil engineering;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Colombia - Second Guadalupe Hydroelectric Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/756051468240866565/Colombia-Second-Guadalupe-Hydroelectric-Project