Details
-
Author
0000A8056
-
Document Date
2014/12/30
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR17484
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Nepal - Bridges Improvement and Maintenance Program : P125495 - Implementation Status Results Report : Sequence 04
-
Keywords
program development;disbursement linked indicators;social and environmental;performance management;management responsibility;urgent attention;issue date;bridge planning;cost center;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
0000A8056
Nepal - Bridges Improvement and Maintenance Program : P125495 - Implementation Status Results Report : Sequence 04 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/759261468324570703/Nepal-Bridges-Improvement-and-Maintenance-Program-P125495-Implementation-Status-Results-Report-Sequence-04