Details
-
Author
-
Document Date
2015/12/28
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR21927
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2015/12/28
-
Disclosure Status
Disclosed
-
Doc Name
Mozambique - Mozambique Transmission Upgrade Project : P084404 - Implementation Status Results Report : Sequence 15
-
Keywords
affordable supply of energy;supply and installation;regional power trade;steel structure;investment loan;civil works;consulting engineer;electricity outages;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Neto,Maria Isabel A. S.
Mozambique - Mozambique Transmission Upgrade Project : P084404 - Implementation Status Results Report : Sequence 15 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/770881468053664075/Mozambique-Mozambique-Transmission-Upgrade-Project-P084404-Implementation-Status-Results-Report-Sequence-15