Skip to Main Navigation

Tanzania - Urban Local Government Strengthening Program Project : environmental assessment : Environmental and social system assessment : analysis (English)

The development objective of the Urban Local Government Strengthening Program Project is to improve institutional performance for urban service delivery in participating urban local government authorities. Negative impacts include air pollution from dust and exhaust; nuisances such as noise, traffic interruptions, and blocking access paths; water and soil pollution from the accidental spillage of fuels or other materials associated with construction works, as well as solid and liquid wastes from construction sites and worker campsites; traffic interruptions and accidents; and accidental damage to infrastructure such as electric, wastewater, and water facilities. Mitigation measures include: 1) to control noise pollution make provisions for properly maintained silencers and mufflers; 2) watering of roads to control a dust; 3) compliance with all Tanzanian transportation laws/standards; 4) signage and signal personnel where appropriate; 5) inspection and maintained of equipments and machinery in good running conditions; 6) any dusty material remaining after a stockpile is removed will be wetted with water and cleared from the site; 7) ashes collected and disposed in accordance with requirements; 8) an oil/water separator to which all drainage from areas likely to have significant oil contamination; and 9) use barriers and security officers.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

Citation

Tanzania - Urban Local Government Strengthening Program Project : environmental assessment : Environmental and social system assessment : analysis (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/775301468116657826/Environmental-and-social-system-assessment-analysis