Skip to Main Navigation

Iraq - Emergency Operation Development Projects : environmental assessment (Vol. 3) : Environmental and social management checklist for rehabilitation of 45.02 km of Samarra - Dor - Alalam road in Salahaddin Governorate (English)

The development objective of Emergency Operation Development Projects for Iraq is to support the country in the reconstruction of damaged infrastructure and the restoration of public services delivery in Targeted Municipal Areas. Some of the negative impacts include : (i) waste from cleaning of blocked drainage should be disposed at vacant land agreed with the local populations; (ii) avoiding earthworks near settlements and dust generation; (iii) limiting noisy activities to normal daylight hours; (iv) keeping the drainage ditches and culverts unblocked; (v) application of liquid fuels and oils in sealed and paved areas with sump; (vi) placing speed limit signs and planting trees at critical locations and known animal crossing pathways; (vii) provision of temporary alternative access roads through by-passes; (viii) installing barriers in sharp curves; (ix) coordinating with the public schedule of maintenance activities in residential areas; and (x) camps must be equipped with sealed septic tanks and waste containers.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Iraq

Iraq - Emergency Operation Development Projects : environmental assessment (Vol. 3) : Environmental and social management checklist for rehabilitation of 45.02 km of Samarra - Dor - Alalam road in Salahaddin Governorate (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/779201511959624853/Environmental-and-social-management-checklist-for-rehabilitation-of-45-02-km-of-Samarra-Dor-Alalam-road-in-Salahaddin-Governorate