Skip to Main Navigation

Vietnam - Trung Son Hydropower Project : resettlement plan (Vol. 7) : Resettlement and ethnic minority development plan (English)

The objective of the Trung Son Hydropower Project for Vietnam is to improve, or at least restore, livelihoods and living standards of affected households and villages while allowing them to maintain their cultural identity. Negative measures include: impacts on land; impacts of crops growing on the land acquired; impacts of assets on lands consist of temporary camps, houses, and other construction works of local inhabitants; and loss of livelihood. Mitigation measures include: a) acquisition of land and other assets, and resettlement of people will be minimized as much as possible; b) affected households will be compensated for affected assets in cash or in kind at replacement cost; c) plans for acquisition of land and other assets and provision of rehabilitation measures will be carried out in consultation with the project affected peoples (PAPs), to ensure minimal disturbance. Entitlements will be provided by PAPs prior to expected start-up of works at the respective subproject sites; d) any acquisition of, or restriction of access to, resources owned or managed by the affected community as a common property should be mitigated by arrangement ensuring access to improved or at least restored resources or access; and e) financial and physical resources for resettlement and rehabilitation will be made available and as where and when required.

Details

  • Document Date

    2013/01/01

  • Document Type

    Resettlement Plan

  • Report Number

    RP857

  • Volume No

    7

  • Total Volume(s)

    7

  • Country

    Vietnam,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2013/04/01

  • Disclosure Status

    Disclosed

  • Doc Name

    Resettlement and ethnic minority development plan

  • Keywords

    power line;affected households;land area;per capita income level;living standard;socio-economic survey;ethnic minority community;land acquisition;national poverty line;ethnic minority household;agriculture and forestry;adverse social impact;method of estimation;average living standard;standard of living;loss of income;child in school;loss of property;customs and traditions;flood control benefit;roller compacted concrete;ratio of male;development of hydropower;improvement of capacity;public health management;supply and installation;loss of asset;types of asset;population at large;poor household;statistical data;socio-economic status;educational level;residential land;ethnic group;dug well;clean water;high school;household size;population structure;vulnerable group;construction period;legal right;production activity;access road;rice field;income restoration;occupational structure;transmission line;kv line;construction site;primary information;kv substation;average distance;vulnerable people;national grid;agricultural land;project impact;population survey;vulnerable household;household level;taxi driver;socioeconomic survey;spiritual culture;working age;school school;residential place;agricultural production;agriculture sector;annual crop;survey sample;delicious dishes;resettlement plan;production purpose;water use;Grocery Store;public well;water source;high-income household;crop loss;ethnic composition;ancient book;land loss;natural disaster;Livestock Husbandry;electric line;surface water;asset value;industry activity;daily life;sweet potato;rain water;handicraft product;winter crop;material loss;foreign tourist;cultural elements;resettlement resettlement;Vocational Training;monthly income;living condition;household income;university level;primary training;healthcare services;compensation payment;commune clinic;transaction cost;compensation amount;education infrastructure;replacement cost;tap water;asset compensation;main dam;state authority;household head;domestic activity;resettlement sites;intake gate;feed crop;mixed forest;hydropower plant;consulting service;Consulting services;environment management;hydropower development;individual household;statistical information;accurate assessment;gender strategy;household affect;field survey;field work;construction camp;resettlement assistance;social status;land use;livelihood improvement;Mental disabilities;reservoir volume;rice area;demographic information;Power Generation;legal framework;residential area;productive land;installed capacity;sustainable hydropower;migration history;construction activities;subproject implementation;survey data;village elder;positive impact;construction contractor;power supply;minority communities;Electric Power;socio-economic development;national defense;historical monuments;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Vietnam - Trung Son Hydropower Project : resettlement plan (Vol. 7) : Resettlement and ethnic minority development plan (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/789901468139764780/Resettlement-and-ethnic-minority-development-plan