Skip to Main Navigation

China - Fuzhou Urban Transport Project : involuntary resettlement plan : Involuntary resettlement plan (English)

The purpose of the Resettlement Plan for the China Fuzhou Urban Transport Project is to work out a resettlement and rehabilitation action plan for the project affected people (PAPs) to ensure that the PAPs will gain benefit from the proposed project and improve their standard of living or at least to rehabilitate their standard of living after the completion of the project. The "project affected people" (PAPs) refers to those whose production or living are affected by the land acquisition for the project. This includes 1) Those whose land (including the land for household plot, public facilities, agriculture, forestry, stockbreeding, fishery and sideline), structures (including private housing and attachments, enterprise buildings or public buildings etc.), entitlements or other properties are partially or wholly, temporarily or permanently acquired and occupied. 2) Those that have used the said land, structures or properties, or whose business, occupation, habitation or habits and customs are detrimentally affected. 3) Those whose living standards are affected due to the land acquisition and resettlement. To ensure the PAPs to get compensation for all their losses, reasonable resettlement and good rehabilitation of life, and make them share project benefit, project affected people (PAP) will be subsidized for their temporary difficulties so as to improve the income and living standard of the individuals, and production and profit-gaining ability of the enterprises or at least rehabilitate them to the level or higher prior to resettlement or beginning of the project.

Details

  • Document Date

    2005/03/01

  • Document Type

    Resettlement Plan

  • Report Number

    RP296

  • Volume No

    1

  • Total Volume(s)

    2

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2010/07/01

  • Doc Name

    Involuntary resettlement plan

  • Keywords

    Economic and Technological Development Zone;Land Acquisition and Resettlement;short period of time;property right;standard of living;traffic service;single parent family;resettlement and rehabilitation;construction of road;air defense;loss of property;land use right;property right owner;production due;availability of resource;acquisition of land;law and regulation;urban housing demolition;internal monitoring system;provincial capital city;flow of people;expansion of population;road network structure;living standard;agricultural land;socio-economic development;Public Facilities;investment environment;road section;residential households;construction work;business environment;vulnerable group;project impact;property loss;household plot;urban construction;foreign country;concrete slab;building use;displaced person;residential registration;local resident;farmer households;socio-economic survey;road facility;traffic pressure;statistical data;public welfare;urban traffic;downtown area;market price;external wall;negative effect;infrastructure facility;vegetable plot;brick wall;paddy field;concrete floor;frame structure;farm land;industrial product;stable employment;road pavement;resettlement plan;property owner;shop drawings;construction period;bearing wall;resident household;floor area;land area;public toilet;clean river;daily life;permanent loss;scenic beauty;protection measure;road alignment;compensation amount;legal entitlement;legal right;Real estate;land classification;power structure;private housing;classification standard;living quality;ownership right;cultural characteristics;cable tv;land rent;residential building;Social organizations;factory buildings;mining land;rural land;building structure;domestic resident;administrative organ;application procedure;water conservancy;local street;commercial building;grazing land;physical condition;wood land;garden plot;cultivated land;social condition;industrial establishments;public building;commercial establishments;soil quality;ecological environment;real asset;artificial person;legal registration;reciprocal compensation;historical land;cultural trait;employment training;secondary road;involuntary resettlement;grade separation;production resource;job opportunities;traffic system;urban expressway;coastal region;living condition;family home;production activity;urban roads;motive power;car demand;national economy;job opportunity;project construction;resettlement fund;resettlement activities;banyan tree;cultural asset;heavy investment;Traffic Jam;career development;work design;road condition;competitive edge;urban development;holistic development;construction cost;coastal city;family living;traffic infrastructure;preferential treatment;expressway network;bridge tower;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China - Fuzhou Urban Transport Project : involuntary resettlement plan : Involuntary resettlement plan (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/820481468746700839/Involuntary-resettlement-plan