Details
-
Author
India
-
Document Date
1996/01/01
-
Document Type
Project Implementation Plan
-
Report Number
19165
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Status
Eligible for Disclosure
-
Doc Name
India - Andhra Pradesh Hazard Mitigation and Emergency Cyclone Recovery Project
-
Keywords
financial account;Flood Control and Drainage;construction of river embankments;bank for review and clearance;procedures for procurement;shelter belt plantations;loss of life;lead acid battery;diversion channel;flood control district;planning and design;flood control scheme;preparation cost;flood embankment;power transformers;procurement schedule;water course;construction standard;power transmission;Leave Bank;road bridge;flood protection;basic structure;masonry structures;watershed management;competitive bidding;mobile teams;Hazard Management;press notice;construction phase;bank for clearance;budget requirement;distribution line;electrical network;transmission tower;Public Infrastructure;transmission line;hydraulic design;cash crop;heavy rain;pump houses;price contingency;public building;electrical installation;coastal area;short distance;restoration work;wind velocity;prior review;work force;financial aspect;
- See More
REQUEST ACCESS
Upon request, this document will be reviewed in accordance with the World Bank Policy on Access to Information.
To request access to this document click here.
Visit Access to Information to learn more