Skip to Main Navigation

Ethiopia/AFRICA- P146883- ET Productive Safety Nets Project 4 (PSNP 4) - Procurement Plan (English)

Details

  • Author

    Berhanu Wolde Michael

  • Document Date

    2017/12/25

  • Document Type

    Procurement Plan

  • Report Number

    STEP5907

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Ethiopia,

    Africa,

  • Region

    Africa,

  • Disclosure Date

    2017/12/25

  • Disclosure Status

    Disclosed

  • Doc Name

    Ethiopia/AFRICA- P146883- ET Productive Safety Nets Project 4 (PSNP 4) - Procurement Plan

  • Keywords

    grievance redress mechanism;applicable procurement method;retroactive financing;advance procurement;wheat grain;baseline survey;hard disk;fax machine;prior review;project effectiveness;single source;consultancy assignment;baseline study;laptop computer;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Berhanu Wolde Michael

Ethiopia/AFRICA- P146883- ET Productive Safety Nets Project 4 (PSNP 4) - Procurement Plan (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/840031514187229532/Ethiopia-AFRICA-P146883-ET-Productive-Safety-Nets-Project-4-PSNP-4-Procurement-Plan