Skip to Main Navigation

India - IN Dam Rehabilitation and Improvement Project : P089985 - Implementation Status Results Report : Sequence 10 (English)

Details

  • Author

    0000A8056

  • Document Date

    2015/05/28

  • Document Type

    Implementation Status and Results Report

  • Report Number

    ISR18078

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    India,

  • Region

    South Asia,

  • Doc Name

    India - IN Dam Rehabilitation and Improvement Project : P089985 - Implementation Status Results Report : Sequence 10

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

0000A8056

India - IN Dam Rehabilitation and Improvement Project : P089985 - Implementation Status Results Report : Sequence 10 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/853871468269417469/India-IN-Dam-Rehabilitation-and-Improvement-Project-P089985-Implementation-Status-Results-Report-Sequence-10