South Africa - Eskom Renewables Support Project : environmental assessment (Vol. 12) : Medupi power plant and associated infrastructure : Delta-Epsilon 6 x 765KV transmission power lines - environmental impact report volume 1 (English)

The objective of the Eskom Renewables Support Project is to facilitate accelerated development of large scale renewable energy capacity in support of the long-term carbon mitigation strategy of South Africa. Negative impacts include: air pollution, noise disturbance, solid wastage, water pollution, and health and safety of worker. Mitigation measures include: 1) minimize on-site storage of petroleum products; 2) ensure proper maintenance procedures in place for vehicles and equipment; 3) deposit solid waste in containers and dispose at municipal waste disposal sites regularly; 4) supply, maintain and enforce the use of mobile toilets at the work sites; 5) negotiate water use for dust suppression and formation compaction with landowners; 6) noise levels associated with civil construction equipment at a distance of 15 metres from the source lie in the range of 75 decibels (dBA) to 100dBA; 7) keep all construction vehicles and equipment in good repair; and 8) avoid noisy night-time activities.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

South Africa - Eskom Renewables Support Project : environmental assessment (Vol. 12) : Medupi power plant and associated infrastructure : Delta-Epsilon 6 x 765KV transmission power lines - environmental impact report volume 1 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/858271468305683934/Medupi-power-plant-and-associated-infrastructure-Delta-Epsilon-6-x-765KV-transmission-power-lines-environmental-impact-report-volume-1