Africa's first bus rapid transit scheme : the Lagos BRT-Lite system (English)

Africa's first bus rapid transit (BRT) scheme began operations on March 17, 2008, in Lagos, Nigeria. Called 'BRT-Lite', it is a form of the BRT system, but it is not of the highest specification like the TransMilenio in Bogota or the Brisbane South East Busway, both of which cost about $6 million per kilometer. This new form of the BRT scheme is aimed at delivering a transport system that will meet the needs of local users, while improving citizens' quality of life, economic efficiency, and safety within a clearly defined budget. More broadly, the evaluation declared the scheme an unprecedented success. The critical success factors were defined as a significant and consistent political commitment, the presence and abilities of a strategic public transport authority in LAMATA (Lagos Metropolitan Area Transport Authority), a scheme definition that concentrates on essential user needs and deliverability within a budget and program, the work undertaken to engage key stakeholders and ensure that they benefit, and a community engagement program that has worked to assure Lagosians that the BRT-Lite system is a community project created, owned, and used by them.

Document also available in :  

Details

  • Author

    Mobereola, Dayo

  • Document Date

    2009/09/01

  • Document Type

    Working Paper (Numbered Series)

  • Report Number

    53497

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Africa,

  • Region

    Africa,

  • Disclosure Date

    2010/07/01

  • Disclosure Status

    Disclosed

  • Doc Name

    Africa's first bus rapid transit scheme : the Lagos BRT-Lite system

  • Keywords

    Public Transport;level of car ownership;Environmental and Social Impact;power to make regulation;journey time;average journey time;mode of travel;islamic development bank;mass transit system;nonbank financial institution;bus rapid transit;freedom of choice;public transportation mode;central business district;road passenger transport;public transport trip;public transport vehicle;place of work;change in status;change in thinking;public education campaign;radio and television;public transport authority;community engagement program;mode of transport;public transportation system;bus transport system;public transport service;mass transit development;integrated transport system;passenger transport network;road transport industry;poor road maintenance;mass transit railway;hours of operation;journey time variability;private sector operator;high fixed cost;public transport mode;qualitative data collection;express service;commercial bus;large bus;shared taxis;Traffic Jam;engineering design;core road;alternative mode;commuter bus;fare level;regulatory control;bus operator;bus system;short distance;bus lane;private operator;focus group;main road;counterparty risk;Financial Sector;productivity gain;working condition;state governors;bus way;vehicular traffic;market entry;limited capacity;consultation process;direct financing;political change;taxi driver;community meetings;bus service;vehicle life;commercial speed;local ownership;primary beneficiaries;third-party risk;public fund;transaction value;financial arrangement;employment categories;passenger ride;motorcycle taxi;travel option;school trip;survey data;travel purpose;Transport Systems;complaint tracking;physically challenged;passenger number;daily ridership;traffic movement;political risk;stakeholder engagement;financing cost;individual default;bus transit;political parties;political party;terminal capacity;shipping cost;construction phase;Public-Private Partnership;climatic condition;public financing;vehicle operating;catastrophe cover;construction stage;bus driver;system access;enforcement agency;standard practice;vehicle fleet;bus franchising;state legislation;stop light;land use;spatial development;federal highway;bus stop;travel mode;support infrastructure;rural transportation infrastructure;exclusive use;physical planning;adequate mitigation;safe operation;storm water;road drainage;contractor for works;federal regulation;operational planning;vehicle availability;pedestrian warning;pedestrian crossing;socioeconomic benefits;low-income population;public expenditure;local traveler;fare elasticity;transport choice;demographic group;weather condition;physical abuse;administrative function;operational level;lorry park;transport supply;rental fee;transportation situation;transport situation;financial basis;fiscal pressure;political priority;secondary road;route planning;traffic system;passenger terminal;regulatory enforcement;social measures;high frequency;road traffic;road length;arterial road;petroleum price;restricted import;residential area;vehicle breakdown;multimodal transport;smaller number;economic efficiency;demand forecast;road marking;holistic approach;bus industry;organizational challenge;improved accessibility;population estimate;metropolitan area;large fleet;inland waterway;political commitment;international partnership;financial contribution;commercial capital;waiting time;average speed;infrastructure needs;passenger access;community support;free movement;vested interests;emergency service;commercial traffic;market segmentation;international norm;deferred payment;enforceable law;personal guarantee;adequate maintenance;risk exposure;local bank;regulatory power;public support;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Mobereola, Dayo

Africa's first bus rapid transit scheme : the Lagos BRT-Lite system (English). Sub-Saharan Africa Transport Policy Program (SSATP) discussion paper ; no. 9 Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/874551467990345646/Africas-first-bus-rapid-transit-scheme-the-Lagos-BRT-Lite-system