Skip to Main Navigation

Colombia - Report on the Anchicaya Hydroelectric Project : Main report (English)

The Anchicaya Hydroelectric Project for Colombia will provide a loan to the Central Hidroelectrica del Rio Anchicaya (CHIDRAL) to cover the costs for the construction of the Anchicaya Center power station with an initial capacity of 24,000 kw. CHIDRAL has full rights to the development of the Anchicaya River which is estimated to have a power potential between 350,000 to 400,000 kw. In order to exploit the power potential of the river, a new station must be developed. The project will accomplish this goal by: 1) constructing a power station; 2) constructing a gravity type dam with a spillway, reservoir, gravity tunnel, surge tank, and penstock; 3) procuring generating equipment consisting of two 17,100 h.p. Francis type turbines; 4) constructing a powerhouse; 5) purchasing transformer equipment; and 6) installing transmission lines. These new additions will help to expand the power supply system in the Anchicaya River area.

Details

  • Document Date

    1950/10/18

  • Document Type

    Staff Appraisal Report

  • Report Number

    L107

  • Volume No

    1

  • Total Volume(s)

    2

  • Country

    Colombia,

  • Region

    Latin America & Caribbean,

  • Disclosure Date

    2010/06/18

  • Disclosure Status

    Disclosed

  • Doc Name

    Main report

  • Keywords

    market for power;cubic meters per second;interest during construction;foreign exchange;supply of power;sources of fund;peak load requirement;increase in capital;sale of power;foreign exchange requirement;loss in revenue;cost of construction;basis of information;water availability;machinery and equipment;construction cost estimate;annual budget appropriation;rates of exchange;cost of labor;foreign exchange expenditures;contract of purchase;transmission line;debt service;diesel plant;working capital;diversion tunnel;Effective Date;total currency;share capital;depreciation charge;distribution loss;electrical equipment;maturity date;equity capital;construction equipment;construction machinery;generating plant;net surplus;hydro plant;construction period;foreign currency;Electric Power;industrial expansion;peak power;legal limit;hydro station;future market;highway network;distribution facility;distribution line;expenditure schedule;public street;contract price;sugar refining;investment amount;capital requirement;base load;population center;agricultural activity;future expenditure;construction expenditures;constant rate;promissory note;purchase price;energy requirement;dam;rainfall data;steel pipe;generate equipment;firm capacity;concrete structure;unit price;earnings prospect;construction material;currency cost;consulting engineer;commercial company;municipal government;audit staff;cash position;cash revenue;civil works;generating capacity;colombian peso;seasonal variation;hydraulic equipment;acquisition cost;international bid;construction schedule;escalation clause;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Colombia - Report on the Anchicaya Hydroelectric Project : Main report (English). Loan series ; no. L 107 Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/877131468240871506/Main-report