Details
-
Document Date
2006/05/12
-
Document Type
Implementation Completion Report Review
-
Report Number
ICRR12401
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2016/09/22
-
Disclosure Status
Disclosed
-
Doc Name
Djibouti - International Road Corridor Rehabilitation Project
-
Keywords
project monitoring and evaluation;vehicle operating cost;civil works;repair and maintenance;social and environmental;disposal of waste;reduction in travel;Environmental Management Plan;performance based contract;axle load;baseline data;local capacity;road work;project costing;supplemental financing;local resident;private contractor;district authority;response time;maximum benefit;unexpected event;Traffic Safety;road corridor;laboratory equipment;construction management;participation process;institutional risk;supplemental credit;project datum;road access;transit corridor;project road;road design;insufficient information;government fund;routine maintenance;Armed Conflict;division manager;payment delays;life span;emergency works;truck accident;road safety;safeguard measure;truck traffic;regional hub;transport cost;institutional aspect;transit country;financing institution;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Djibouti - International Road Corridor Rehabilitation Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/882021474590809299/Djibouti-International-Road-Corridor-Rehabilitation-Project