China - Sichuan Power Transmission Project : environmental impact assessment report (Vol. 2) : Ertan hydroelectric project : envrionmental assessment & resettlement (English)

The purposes of the environmental assessment report are to: 1) forecast the short- and long-term adverse environmental impacts of the project; 2) adopt a series of protection measures so as to eliminate or/and minimize the adverse environmental impacts during the construction and operation periods; 3) establish the environmental facilities and carry out environmental monitoring as well as supervise the implementation of protection measures; and 4) calculate the investment needed for environmental protection. The study analyzes the impacts of the project on: forests, mineral resources, wildlife and conservation areas, scenery and aesthetics and farmland. The study also discusses the impacts of the environment on the transmission line such as: unfavorable geological conditions, high elevations, heavy icing, air pollution, and forest fires.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Sichuan Electric Power Company

China - Sichuan Power Transmission Project : environmental impact assessment report (Vol. 2) : Ertan hydroelectric project : envrionmental assessment & resettlement (English). World Development Sources, WDS 1997-2 Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/890621468746705878/Ertan-hydroelectric-project-envrionmental-assessment-resettlement