DETAILS
-
2019/06/28
-
Implementation Status and Results Report
-
ISR37711
-
1
-
1
-
2019/06/28
-
Disclosed
-
Disclosable Version of the ISR - PE Optimization of Lima Water and Sewerage Systems - P117293 - Sequence No : 16
-
water and sewerage service
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 209
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Marmanillo,Iris.
Disclosable Version of the ISR - PE Optimization of Lima Water and Sewerage Systems - P117293 - Sequence No : 16 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/898981561734482774