Skip to Main Navigation

Kazakhstan - South West Road Project : Western Europe - Western China international transit corridor : environmental assessment : Environmental and social impact assessment for Kurty - Burybailtal road section (Km 2295 - Km 2380) (English)

The development objective of the South West Road Project : Western Europe - Western China international transit corridor is to increase transport efficiency on the road sections between Aktobe/Kyzylorda oblast border and Shymkent, and to improve road management and traffic safety in Kazakhstan. Negative impacts include: impacts on flora and fauna, dust, air quality, water pollution, waste management, soil erosion, and noise pollution. Mitigation measures include: ensuring high quality condition of the road surface throughout the operation period to minimize noise and particularly air pollution which has adverse impacts on fauna and can also impact sensitive flora; ensure fauna can make use of culvert and other crossing points by special treatment of the culvert floor (putting sand/soil on the floor); ensure, through proper construction management, that oil and other spills do not occur, and that if they do immediate action is taken to minimize impacts on the soil; storage of construction materials only takes place in properly prepared locations; immediate sorting and removal of construction debris to an offsite landfill; all surface water courses in all construction are to be protected by settling ponds and filters; waste water from construction camps to be treated on site before discharge into surface rivers; and septic sludge from toilets to be taken to offsite treatment plants.

Details

  • Author

    0000A8056

  • Document Date

    2015/03/01

  • Document Type

    Environmental Assessment

  • Report Number

    SFG1011

  • Volume No

    1

  • Total Volume(s)

    2

  • Country

    Kazakhstan,

  • Region

    Europe and Central Asia,

  • Disclosure Date

    2017/06/01

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental and social impact assessment for Kurty - Burybailtal road section (Km 2295 - Km 2380)

  • Keywords

    lane road;repair and maintenance;environment protection;cost of water supply;Environmental and Social Safeguard;project design and implementation;hydrological regime of rivers;environmental and social management;legislation and regulation;legal act;flora and fauna;water bodies;road section;investment and development;construction and operation;environmental due diligence;movement of animal;atmospheric air;public hearing;environmental protection requirements;land use pattern;environmental protection measures;emission limit value;surface water contamination;generation of waste;adverse environmental impact;sources of water;cases of land;emergency preparedness plan;conversion of land;Environmental Management Plan;road traffic noise;machinery and equipment;personal protective equipment;water supply source;allotment of land;improvement of road;location of road;persistent organic pollutant;maximum allowable concentration;prevention of pollution;international good practice;local environmental authority;water treatment plant;project road;mitigation measure;land acquisition;road alignment;land plot;ecological expertise;water resource;water reservoir;public consultation;water protection;environmental condition;administrative framework;safeguard policy;climatic zone;Safeguard Policies;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

0000A8056

Kazakhstan - South West Road Project : Western Europe - Western China international transit corridor : environmental assessment : Environmental and social impact assessment for Kurty - Burybailtal road section (Km 2295 - Km 2380) (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/903571474316403093/Environmental-and-social-impact-assessment-for-Kurty-Burybailtal-road-section-Km-2295-Km-2380