The objective of the Jiangsu Wuxi Lake Tai Environment Project for China is to demonstrate cost-effective options to reduce pollution levels in rivers, streams and surface flows in the Lake Basin, and the Meiliang Lake. Negative measures include: air pollution, solid waste, ecology, noise pollution, and water pollution. Mitigation measures include: a) the sites for construction, material stockpile, such as fuels and chemicals should be kept far away from rivers and ditches. Powder materials should be covered; b) the sites for construction and material storage should be planted with grass or provided with soil filter net, to prevent soil erosion by rainfall; c) construction sites should be far away from sensitive receptors; d) workers should be provided with protective device such as ear plug when working near noisy equipment; e) the river dredging works should be scheduled in low flow season, and the dredged sediments should be transported to the site designated by relevant department; f) the recyclables in the construction solid waste should be collected, and the remaining should be transported to the site designated by relevant departments for disposal. Permit should be obtained for transportation of the solid waste; and g) close communication with weather forecast department should be kept and the unpaved ground should be covered before heavy rains.
Details
-
Document Date
2010/05/01
-
Document Type
Environmental Assessment
-
Report Number
E2483
-
Volume No
4
-
Total Volume(s)
4
-
Country
-
Region
-
Disclosure Date
2010/07/01
-
Disclosure Status
Disclosed
-
Doc Name
Environmental management plan
-
Keywords
Soil and Water Conservation;Environmental Management Plan;ambient air quality standard;compensation for land;sewerage treatment plant;sewage treatment plant;construction and operation;atmospheric pollutant;daily average;environmental management activities;chemical oxygen demand;maximum allowable concentration;Social Impact Assessment;surface water;reclaimed water;environmental supervision;environmental monitoring;emission standard;deterioration of water;biochemical oxygen demand;international financial organization;drinking water safety;Urban Water Supply;management of water;disposal of sludge;contractors and construction;water pollution prevention;environmental carrying capacity;environmental protection measures;source of funding;per capita income;technology and resources;adverse environmental effect;rural area;mitigation measure;project construction;hydrogen sulfide;water quality;pollution control;Sewage Disposal;Safeguard Policies;safeguard policy;allowable emission;residential area;sanitary standard;construction period;hexavalent chromium;odor pollutant;agricultural production;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
China - Jiangsu Wuxi Lake Tai Environment Project : environmental assessment (Vol. 4) : Environmental management plan (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/905391468212987814/Environmental-management-plan