Details
-
Author
-
Document Date
2020/06/23
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR42145
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/06/23
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Sindh Resilience Project - P155350 - Sequence No : 08
-
Keywords
flood and drought risk; disaster and climate risk management; flood embankment; civil works; small dam; natural disaster; disaster risk management; emergency operations center; Investment Project Financing; million people; early warning; operational procedure; medical equipment; test kit; quarantine facility; health authorities; operation risk; land area; project intervention; survey results; irrigation department; public consultation; emergency response; infrastructure component; infrastructure contract; Disaster Management; safety measure; vulnerability assessment
See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Tehsin,Ahsan
Disclosable Version of the ISR - Sindh Resilience Project - P155350 - Sequence No : 08 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/912621592935448442/Disclosable-Version-of-the-ISR-Sindh-Resilience-Project-P155350-Sequence-No-08