Skip to Main Navigation

Togo - Nangbeto Hydroelectric Project - Benin (English)

The Nangbeto Hydroelectric Project will: (i) help to minimize the long-term cost of electricity supply in Benin and Togo; (ii) provide hydropower (63 MW) and energy (about 150 GWh annually) to help meet increased demand for electricity and reduce fuel costs and improve CEB's interconnected system operation. (iii) Furthermore, The project plans to strengthen power sector institutions in both countries and, in particular, CEB's co-ordinating role and the sectors capability in planning, engineering, management and financial operations; and (iv) improve sector efficiency through technical assistance and a joint training program. The proposed project comprises: (a) the Nangbeto hydroelectric development, and associated transmission, together with related engineering and other services. It also involves; (b) studies of the feasibility of a future hydroelectric project (Adjarala) and load dispatching arrangements; (c) technical assistance; and (d) training.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Togo - Nangbeto Hydroelectric Project - Benin (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/918921468338492241/Togo-Nangbeto-Hydroelectric-Project-Benin