India - Bihar Kosi Flood Recovery Project (English)

Details

  • Document Date

    2010/07/27

  • Document Type

    Integrated Safeguards Data Sheet

  • Report Number

    AC5574

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    India,

  • Region

    South Asia,

  • Disclosure Date

    2010/07/27

  • Disclosure Status

    Disclosed

  • Doc Name

    India - Bihar Kosi Flood Recovery Project

  • Keywords

    Occupational health and safety;Environmental and Social Impact;environment and social management;Environmental and Social Safeguard;adverse environmental impact;road and bridges;loss of land;adverse social impact;flood management;road construction activity;functions and implementation;loss of livelihood;Water Resource Management;transportation of materials;digital elevation model;flood early warning;asset management system;response to crisis;risk reduction efforts;risk and vulnerability;natural disaster management;increased agricultural productivity;community investment fund;small land holding;community institution;damage to infrastructure;Technical Assistance Fund;Special Purpose Vehicle;repair of infrastructure;natural disaster risk;decline in productivity;construction of road;safety of dam;Safeguard Policies;safeguard policy;affected districts;natural drainage;public place;livelihood opportunity;flood forecast;reconstruction activities;cultural property;Housing reconstruction;construction stage;social aspect;sediment management;forest land;safeguard issue;irreversible impacts;improper disposal;civil works;water logging;Flood Recovery;development work;damaged house;physical environment;involuntary resettlement;component outcomes;land availability;participatory approach;large population;human population;population size;physical model;collaborative networks;environmental issue;resource availability;environmental specialist;financial aspect;project costing;irrigation infrastructure;subproject cycle;Proposed Investment;safe housing;risk map;flood event;investment need;vulnerable group;agricultural land;indigenous people;Indigenous Peoples;consultation process;natural habitat;physical characteristic;river training;construction technique;financial capital;embankment height;erosion management;sand casting;safeguard analysis;upper watershed;accelerated erosion;sediment load;human intervention;work force;drainage work;affected population;contingency fund;debt level;productive asset;micro enterprise;basket weaver;consulting service;poor household;incremental cost;Consulting services;regular supervision;local ngo;notification requirement;construction material;resettlement plan;irrigation works;road development;road work;emergency response;focused training;landless laborer;state agency;institutional responsibilities;environmental aspect;road infrastructure;field staff;Bank Fund;independent assurance;safety management;residual material;natural factors;railway track;flood preparedness;health issue;social outcome;applicable law;project execution;environmental degradation;cumulative effect;living standard;displaced person;gene pool;Bank Policies;administrative control;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

India - Bihar Kosi Flood Recovery Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/924731468268477672/India-Bihar-Kosi-Flood-Recovery-Project