China - Ningxia Highway Project : resettlement plan : Resettlement action plan for national highway 211 Guyaozi-Qingtongxia linking expressway (Chinese)

The development objective of the Ningxia Highway Project of China is to improve the attractiveness and competitiveness of the Ningxia autonomous region through a more effective, equitable, and sustainable use of the regional road infrastructure in support of industry and poor agricultural producers as measured by reduced transit times on improved highways and improved access for rural communities. Negative impacts of the project include: permanent land acquisition, structure to demolished, affected people, affected trees, and affected vulnerable groups. Mitigation measures include: (a) involuntary resettlement and land acquisition will be avoided/minimized as much as possible; (b) if resettlement and land acquisition cannot be avoided, action plans will be prepared for compensation and rehabilitation of the affected people; (c) adequate funds will be timely provided for implementing such action plans; (d) preparation and implementation of such action plans will be conducted in consultation with the local governments and the affected people, on all the components with resettlement and compensation; (e) compensation will be paid at replacement costs without depreciation; (f) compensation will be paid prior to the move and acquisition of land; (g) the affected people will be assisted during relocation and in their livelihood rehabilitation activities; (h) the living standards of the affected people will be restored at least or improved after resettlement activities; (i) all the costs related to land acquisition and structure demolition will be included in the project cost estimates; and j) the action plans will be prepared on an annual basis for each county, and the plans will be reviewed by the province/municipality and be accepted by the World Bank before the relevant civil engineering work.

Details

  • Document Date

    2009/08/01

  • Document Type

    Resettlement Plan

  • Report Number

    RP865

  • Volume No

    1

  • Total Volume(s)

    2

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2009/09/28

  • Disclosure Status

    Disclosed

  • Doc Name

    Resettlement action plan for national highway 211 Guyaozi-Qingtongxia linking expressway

  • Keywords

    ,,

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China - Ningxia Highway Project : resettlement plan : Resettlement action plan for national highway 211 Guyaozi-Qingtongxia linking expressway (Chinese). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/925551468219578213/Resettlement-action-plan-for-national-highway-211-Guyaozi-Qingtongxia-linking-expressway