This is an environmental management plan for the Second Southern Provincial Rural Electrification (Phase 1) Project, which builds transmission lines for rural electrification. It assesses potentially negative environmental impacts and proposes measures to mitigate them. Although major impacts are not expected, these are among the risks to be mitigated: Avoid unneeded tree cutting by clearly marking paths and trees to be cut. Reduce noise by doing construction during daytime only and securing the village approval before night scheduling. Routinely monitor health of workers and provide them with safety gear to minimize injury and illness. Install danger warning signs to protect communities. Avoid burning trees near the power lines. Prevent transformer leaks that may contaminate water courses by regular inspections and cleaning and disposing of any spilled insulating/cooling oils.
Details
-
Author
Electricite du Lao
-
Document Date
2005/01/01
-
Document Type
Environmental Assessment
-
Report Number
E995
-
Volume No
33
-
Total Volume(s)
-
Country
-
Region
-
Disclosure Date
2010/07/01
-
Doc Name
Subproject in Saybouly2 District, Savannakhet Province
-
Keywords
elderly woman;environmental and social management;rice paddy field;monitoring plan;Electricite du Laos;kv line;consultation meeting;construction work;village head;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Electricite du Lao
Lao, Democratic Republic of - Second Southern Provinces Rural Electrification (Phase 1) Project : environmental management plan (Vol. 33) : Subproject in Saybouly2 District, Savannakhet Province (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/938621468752967978/Subproject-in-Saybouly2-District-Savannakhet-Province