China - Zhejiang Qiantang River Basin Small Town Environment Project : environmental assessment : Consolidated environmental assessment report : executive summary (English)

The development objective of the Zhejiang Qiantang River Basin Small Town Environment Project for China is to assist Zhejiang province in increasing access to sustainable urban environmental infrastructure in selected cities, districts and towns in the Qiantang river basin. Negative impacts include: noise, air and water pollution, traffic, wastewater, dust, drainage, soil erosion, sludge, garbage, and spoil and building waste. Mitigation measures include: 1) sludge will be tested regularly to check if the presence of toxic substance; 2) the noise emissions will be minimized by acoustic insulation of machinery where there are sensitive noise receptors close to the facilities; 3) environmental monitoring before the closure of dump site, and regular monitoring after the closure of the dump sites will be conducted; 4) install and maintain an adequate drainage system to prevent erosion on the site during and after construction; 5) minimize production of dust and particulate materials at all times, including spray water, during dry and windy days, on construction sites; 6) avoid construction activities at night, and in case of construction at night cannot be avoided, ensure that night work is carefully scheduled and the community is properly informed; 7) waste soil and construction waste shall be filled into the designated places according to the municipal and planning department; 8) set garbage bins, and transport to the Zhuji city landfill; and 9) equip with sludge dehydration and drying equipment, sludge shall be transported externally for covering up after dehydration.

Details

  • Author

    China,Andreea-Mirela

  • Document Date

    2010/04/01

  • Document Type

    Environmental Assessment

  • Report Number

    E2472

  • Volume No

    1

  • Total Volume(s)

    39 (See all volumes)

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2010/05/03

  • Disclosure Status

    Disclosed

  • Doc Name

    Consolidated environmental assessment report : executive summary

  • Keywords

    noise pollution;reduction of pollution load;cubic meters of wastewater;solid waste collection vehicle;raw water pumping station;Environmental and Social Impact;analysis of alternatives;wastewater treatment plant;storm water;public consultation;safety of dam;construction and operation;environmental supervision;Full Environmental Assessment;environment impact assessment;mitigation measure;surface water quality;waste collection service;urban environmental sanitation;personal protective equipment;wastewater treatment capacity;water distribution network;water supply facilities;effluent discharge standard;water quality impact;treatment of wastewater;rapid economic development;adverse environmental impact;law and regulation;provision of sewage;wastewater treatment service;pollution abatement program;garbage collection fleet;Environmental Management Plan;water supply pipe;sanitary landfill site;average annual rainfall;time of day;solid waste sector;treatment water treatment;raw water transmission;dump site;legal framework;water pipeline;leachate treatment;sewerage system;construction site;odor emission;public health;environmental infrastructure;land area;involuntary resettlement;environmental monitoring;rural area;monitoring plan;regular monitoring;investment component;buffer zone;small cities;leachate collection;treatment facilities;safeguard policy;main sewer;road expansion;conservation law;property value;positive impact;administrative boundary;lift pump;aquatic environment;work schedule;environment management;project costing;Safeguard Policies;governmental information;field visits;appraisal mission;management personnel;international waterway;water pollution;national regulatory;Cultural Heritage;future water;night work;construction activities;safety training;worker safety;health improvement;environmental staff;environmental terms;soil erosion;geographic location;drainage system;waste treatment;pipeline installation;disposal plan;international consultant;adequate mitigation;sewage pipe;water tank;water main;landfill disposal;toxic substance;natural habitat;coverage rate;climate zone;Population Growth;improved sanitation;water bodies;catchment area;wastewater discharge;incineration facility;groundwater pollution;acoustic insulation;livestock waste;noise emission;textile industry;aquatic ecology;fish species;treatment rate;aquatic plant;aquatic insect;disposal technology;paper product;industrial pollution;river section;short period;environmental benefit;oxidation ditches;monitoring program;sludge disposal;cost-effective option;Indigenous Peoples;civil works;secondary treatment;urban river;residential area;land occupation;concerned parties;environmental training;construction dust;groundwater quality;sludge cake;chemical fertilizer;gas generation;wastewater collection;comparative analysis;site selection;effluent quality;open dump;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China,Andreea-Mirela

China - Zhejiang Qiantang River Basin Small Town Environment Project : environmental assessment : Consolidated environmental assessment report : executive summary (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/944231468019148797/Consolidated-environmental-assessment-report-executive-summary