DETAILS
-
2017/11/17
-
Implementation Status and Results Report
-
ISR29970
-
1
-
1
-
2017/11/17
-
Disclosed
-
Disclosable Version of the ISR - BD Rural Water Supply and Sanitation Project - P122269 - Sequence No : 11
-
piped water supply
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 307
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Ahamed,Arif.
Disclosable Version of the ISR - BD Rural Water Supply and Sanitation Project - P122269 - Sequence No : 11 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/953021510896434010