China - Bengbu Integrated Environment Improvement Project : environmental assessment (Vol. 6) : Environmental impact assessment report for Lilou road and Fengandong road (Chinese)

The primary project development objective is to address Bengbou's key bottleneck, such as inadequate flood control or inadequate water resource management, impeding Bengbou's economic development though priority urban infrastructure investments. The following measures and monitoring and evaluation mechanisms should be taken to minimize the environmental impacts and boost the project construction: sludge that can not be cleaned and transported will put in straw bags for storage in order to reduce dust and odor emission and avoid impact on the quality of life of residents nearby; wheels of trucks exiting the construction site should be washed to remove dirt or clay to avoid dust propagation; removed vegetation should be restored for the conservation of soil against erosion and sedimentation; daily maintenance and regular inspection to fuel burning vehicles and construction machinery should be strengthened for engines to operate at normal and good standards, tail gas emission purifiers should be installed to make tail gas comply with discharged standards; wood wasted building materials from construction will not be allowed to reused as fuel; construction time for high-noise and high vibration equipments shall be arranged for daytime hours to reduce noise generation during night construction hours; reduce transportation traffic during night hours and establish speed limits for large trucks, particularly when driving thorough residential areas; pile-up of building wasted materials in prohibited; transport vehicles carrying solid waste material must be load appropriately and covered with a tarpaulin to avoid spilling; excavation during construction period should be avoid during raining season; oil and chemical products must be kept away from river and water sources; develop a plan to handle possible leakage accidents caused by collapse and sludge flowing out into waters or farmland leading to secondary pollution; emergency preparation plan should be done in advance by project managers for the occurrence of problems impacting residential water supply and toxic discharge during construction; and finally, promote an educational campaign for contractors, beneficiaries and project staff on environmental safe practices.

Details

  • Document Date

    2013/07/01

  • Document Type

    Environmental Assessment

  • Report Number

    E1699

  • Volume No

    6

  • Total Volume(s)

    6

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2013/07/29

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental impact assessment report for Lilou road and Fengandong road

  • Keywords

    construction period;high speed railway;water quality;pollution prevention;solid waste pollution;municipal party committee;land use;public consultation;water quality standard;city area;physical cultural resources;underground water resource;gains and losses;Supply of Water;construction and operation;natural water resource;residential area;social environment;annual average temperature;positive impact;water quality index;soil erosion prevention;drinking water source;construction of road;noise sensitive area;passenger transport service;environmental protection measures;land management law;total energy consumption;cost of land;law of people;city economic development;comprehensive transport plan;ambient air quality;pollutant emission amount;municipal economic development;provincial capital city;environment impact assessment;average wind speed;environmental assessment process;class standard;flow chart;project construction;environment quality;natural environment;water level;daily average;preventive measure;soil type;air pollutant;environment protection;building site;main road;urban traffic;pollution source;Urban Infrastructure;central city;vehicle flow;acoustic environment;engineering analysis;sound level;Sewage;noise source;environment assessment;geographic location;protection zone;leisure experience;water storage;water environment;noise environment;metamorphic rock;project impact;disposable income;construction camp;land surface;resettlement plan;construction site;water area;land acquisition;material consumption;raw material;drainage system;Urban Planning;living quality;sewage system;environment management;branch road;fishing water;ph value;cross sections;acid rain;support system;temperate zone;lake environment;bridge land;forest zone;industrial zone;annual output;coarse cereal;project road;urban development;municipal revenue;interior space;city expansion;public bus;concrete road;outer-ring road;city environment;point distribution;travel condition;city region;noise monitoring;assessment method;local income;Fixed Assets;noise level;retail sale;site selection;pollution level;state law;drainage plan;water flow;rainfall distribution;monsoon climate;average rainfall;sea transport;container yard;hill area;benefit analysis;zone development;quaternary period;pump station;expert panel;investment group;power supply;landscape engineering;city resident;landscape protection;impact analysis;land occupation;compensation measures;IS Building;regulation concern;stone work;concrete mixer;interior decoration;social surveys;quantitative analysis;project's impact;coastal city;engineering design;urban landscape;noise impact;housing area;wind direction;river bed;main river;surface area;social construction;brown soil;shallow water;passenger train;railway freight;agricultural ecology;industrial structure;electronic product;residential facility;material resource;city infrastructure;highway network;city plan;assessment result;city scale;city planning;urban developing;construction drawing;box culvert;city nature;city construction;commercial service;road section;ground level;noise pollution;environment area;short period;assessment standard;surface water;water bodies;index standard;administrative offices;waste water;air impact;competent authority;safeguard policy;Safeguard Policies;project selection;construction impact;natural habitat;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China - Bengbu Integrated Environment Improvement Project : environmental assessment (Vol. 6) : Environmental impact assessment report for Lilou road and Fengandong road (Chinese). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/956891468219569780/Environmental-impact-assessment-report-for-Lilou-road-and-Fengandong-road