Details
-
Author
Xiaoming Li
-
Document Date
2019/10/15
-
Document Type
Procurement Plan
-
Report Number
STEP25532
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2019/10/15
-
Disclosure Status
Disclosed
-
Doc Name
China - EAST ASIA AND PACIFIC- P148294- Wuhan Integrated Transport Development - Procurement Plan
-
Keywords
evaluation activity; contract completion; credit market; transfer hub; intelligent transportation system; water supply and drainage; intelligent traffic management; civil engineering; road safety; railway station; cycle traffic; Revised Plan Date; bus system; bus procurement; electric bus; post qualification; transport development; signal control; Exchange Rates; rail station; passenger terminal; traffic engineering; transfer facility; technical center; Parking Lot; civil works; traffic barrier; bus terminal; transportation infrastructure; technical proposal; bus route; domestic competitive; construction cost; cost control
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Xiaoming Li
China - EAST ASIA AND PACIFIC- P148294- Wuhan Integrated Transport Development - Procurement Plan (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/973701571108705338/China-EAST-ASIA-AND-PACIFIC-P148294-Wuhan-Integrated-Transport-Development-Procurement-Plan