Details
-
Author
-
Document Date
2021/06/29
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR47400
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2021/06/29
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - East-West Highway Corridor Improvement - P149952 - Sequence No : 10
-
Keywords
civil works; road user cost; institutional strengthening; construction of underpasses; Investment Project Financing; logistics service; risk category; front-end fee; beneficiary feedback; consultancy assignment; operation risk; water pipe; asset value; transportation need; land acquisition; result indicator; transport need
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Ali,Aymen Ahmed Osman
Disclosable Version of the ISR - East-West Highway Corridor Improvement - P149952 - Sequence No : 10 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/986111624983384961/Disclosable-Version-of-the-ISR-East-West-Highway-Corridor-Improvement-P149952-Sequence-No-10