Skip to Main Navigation

Colombia - Bogota Power Distribution Project (English)

Details

  • Document Date

    1990/12/21

  • Document Type

    Project Completion Report

  • Report Number

    9226

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Colombia,

  • Region

    Latin America & Caribbean,

  • Disclosure Date

    2010/06/18

  • Disclosure Status

    Disclosed

  • Doc Name

    Colombia - Bogota Power Distribution Project

  • Keywords

    transmission and distribution system;preparation of bidding documents;Project Preparation and Appraisal;investment program;internal cash generation;energy loss;condition of effectiveness;overdue accounts;power loss;penalties for fraud;bank's procurement guidelines;bank supervision missions;energy distribution system;energy and power;authorization of contract;government's development strategy;power sector expansion;bank's procurement procedures;bid evaluation process;average tariff increase;average incremental cost;freedom of action;fixed monthly charge;increase tariff;interest during construction;total debt service;forecast balance sheet;high energy loss;urban population growth;Solid Waste Management;infrastructure and services;informal housing areas;import license;bank's guidelines;procurement process;distribution facility;residential tariff;account receivable;Hydro Power;transmission line;financial efficiency;power company;tariff structure;power system;external borrowing;street light;tariff policy;colombian peso;installed capacity;special account;sales growth;congressional approval;borrower performance;Consulting services;financial capability;local legislation;local costs;account payable;foreign costs;financial difficulties;transmission system;income statement;planning activity;residential consumption;village electrification;industrial categories;energy operation;statistical data;dam strengthening;electric utilities;legal advice;power factor;communications equipment;Electric Power;economic recession;government entity;loss reduction;debt crisis;Positive Action;engineering design;load center;national resource;supervisory agency;administrative aspects;contracting procedure;land purchase;demand estimates;external intervention;unforeseen circumstance;asset insurance;civil works;bank participation;procedural delays;publicity campaign;professional advice;special arrangement;procurement program;bank's comments;reporting requirement;retroactive financing;procurement staff;procurement problems;debt-equity ratio;electricity rate;uniform tariff;residential sector;prospective bidder;financial covenant;electricity service;coverage ratio;bidding procedures;bank's agreement;financial indicator;forecast performance;energy purchase;guarantee agreement;commercial term;regional planning;financing capacity;bank borrower;voluntary association;serviced land;water authority;municipal account;thermal plant;loan account;title registration;financial situation;consumer category;commercial tariff;urban transport;project costing;urban efficiency;institutional mechanism;complementary policies;procurement rule;tariff study;statistical information;energy source;macro policies;macro policy;annex annex;hydro site;energy requirement;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Colombia - Bogota Power Distribution Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/986461468240562569/Colombia-Bogota-Power-Distribution-Project