This note describes the effort to conduct a multidimensional rigorous impact evaluation of the Bus Rapid Transit pilot Project and the Regional Express Train in Dakar, Senegal. This note is focused on setting up these measurement systems and evaluation, with results of the study forthcoming since the BRT project is in its early operational phase, requiring additional time before impacts can be measured effectively. It provides a model framework for...
Exibir mais
DETALHES
-
2025/02/04
-
Report
-
197036
-
1
-
2025/02/05
-
Disclosed
-
Impact Evaluation of the Bus Rapid Transit (BRT) Project and the Regional Express Train (TER) in Dakar, Senegal : Compilation of Intermediate Results
DOWNLOADS
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
-
Total Downloads** : 61
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.