This report is an annex to the main modelling report (Output 5 - Report on advice provided to MWF in the preparation of draft FHRMs) in which the methodologies applied for hazard and risk mapping are described. The main modelling report highlights particular agreements that were considered additionally during the modelling activity. Each annex report summarizes, per RBA and for the Danube River, the water system and the models that were developed...
Exibir mais
DETALHES
-
2024/03/06
-
Report
-
188170
-
1
-
2024/03/07
-
Disclosed
-
Annex 1 – RO1000 Danube River Report
DOWNLOADS
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
-
Total Downloads** : 50
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.