Skip to Main Navigation

ANNEX 1 – RO02 Jiu Rba Report (Inglês)

This report is an annex of to the main modelling report (Output 5 - Report on advice provided to MWF in the preparation of draft FHRMs) in which the methodologies applied for hazard and risk mapping are described. The main modelling report highlights particular agreements that were considered additionally during the modelling activity. Each annex report summarizes per RBA and for the Danube River the water system and the models that were developed...
Exibir mais

DETALHES

  • 2024/03/06

  • Report

  • 188171

  • 1

  • Romênia,

  • Europa e Ásia Central,

  • 2024/03/07

  • Disclosed

  • ANNEX 1 – RO02 Jiu Rba Report

DOWNLOADS

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

This document is being processed or is not available.