The development objective of Power System Development Project is to increase capacity and improve reliability of the power transmission system in Moldova. Some of the negative impacts include: (i) Loss of annual crops; (ii) Loss of perennial crops; (iii) Damages to land productivity due to construction; (iv) Permanent loss of land; (v) Loss of wood and non-wood products;(vi) Loss of subsidies/grant s associated with crops; (vii) Loss of access / Incapacity...
Exibir mais
Document also available in :
Inglês
DETALHES
-
2023/12/01
-
Plano de reassentamento
-
SFG8010
-
1
-
2024/05/24
-
Disclosed
-
Moldova - Power System Development Project : Resettlement Action Plan for Construction of a New Vulcanesti-Chisinau 400 kV OHTL
DOWNLOADS
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
-
Total Downloads** : 157
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.