Skip to Main Navigation

Solomon Islands - Tina River Hydropower Development Project : C‐10 Drainage, Erosion and Sediment Control Plan (Inglês)

The development objective of Tina River Hydropower Development Project is to increase the share of renewable energy through hydropower in Solomon Islands. Some of the negative impacts include: (i) impacts on sensitive receptors, roadside properties, water sources from road design, alignment and construction; (ii) increase in traffic volumes from workforce commute and provision of adequate parking; (iii) damage to project roads and wider road network...
Exibir mais

DETALHES

  • 2023/09/01

  • Avaliação Ambiental

  • SFG7751

  • 1

  • Ilhas Salomão,

  • Leste Asiático e Pacífico,

  • 2023/09/21

  • Disclosed

  • Solomon Islands - Tina River Hydropower Development Project : C‐10 Drainage, Erosion and Sediment Control Plan

DOWNLOADS

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

This document is being processed or is not available.