The development objective of Khorezm Solar IPP Project is to increase the private sector-led renewable energy supply in Uzbekistan. Some of the mitigation measures include: strategies to reduce the water use will be identified and implemented in the construction phase; ensure that pipes and taps supplying the water are maintained on a regular basis to avoid water being lost through leakages; use generators only when necessary; perform periodic maintenance...
Exibir mais
DETALHES
-
2024/04/01
-
Avaliação Ambiental
-
193797
-
1
-
2024/10/01
-
Disclosed
-
Uzbekistan - Khorezm Solar IPP Project : Wastewater Management Plan for Construction Phase
DOWNLOADS
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
-
Total Downloads** : 30
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.