Skip to Main Navigation

Argentina - Metropolitan Buenos Aires Urban Transformation Project : Environmental Assessment (Vol. 14 of 10) : Environmental and Social Management Plan : Renewal of the Network of Low Voltage Power Supply in the Massif of Barrio Padre Carlos Mugica - Lot 2 (Espanhol)

DETALHES

  • 2022/12/01

  • Avaliação Ambiental

  • SFG4428

  • 14

  • 10 (Ver todos os volumes)

  • Argentina,

  • América Latina e Caribe,

  • 2023/01/25

  • Disclosed

  • Environmental and Social Management Plan : Renewal of the Network of Low Voltage Power Supply in the Massif of Barrio Padre Carlos Mugica - Lot 2

DOWNLOADS

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

This document is being processed or is not available.