Skip to Main Navigation

Uganda - Irrigation for Climate Resilience Project : Resettlement Plan (Vol. 3) : Sectional Resettlement Action Plan for Kabuyanda Main Pipeline, Isingiro District : Addendum No. 2 (Inglês)

The development objective of the Irrigation for Climate Resilience Project for Uganda is to focus on increasing agricultural productivity and institutional capacity for irrigation service delivery in targeted areas of Uganda. Some of the negative impacts are include: (i) land used for residence partially affected, limited loss; (ii) Land and assets used for residence severely affected; (iii) partially or fully affected buildings and structures; (iv) entire structures are affected or partially affected; (v) loss of public structures, loss of land; (vi) crops affected by land acquisition or temporary acquisition or easement; (vii) temporary acquisition; (viii) loss of cultural property; (ix) loss of trees; and (x) loss of crops or trees. Some of the mitigation measures include: (i) cash compensation for affected land at replacement value; (ii) land for land replacement or compensation in cash according to PAP’s choice; (iii) cash or in-kind compensation for affected building and other fixed assets at replacement cost; (iv) cash or in-kind compensation; (v) compensation to owners or operators as agreed by the management of the institutions; (vi) livelihood restoration assistance; (vii) cash compensation for any assets affected; (viii) relocation assistance for moving of asset to a secure site; (ix) replacement of trees in another area within the forest reserve outside the project site; and (x) cash compensation for developments on the land.

Detalhes

  • Autor

    Borrowing Agency

  • Data do documento

    2021/12/31

  • TIpo de documento

    Plano de reassentamento

  • No. do relatório

    SFG5158

  • Nº do volume

    3

  • Total Volume(s)

    2

  • País

    Uganda,

  • Região

    Africa East,

  • Data de divulgação

    2022/02/24

  • Disclosure Status

    Disclosed

  • Nome do documento

    Sectional Resettlement Action Plan for Kabuyanda Main Pipeline, Isingiro District : Addendum No. 2

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.