Skip to Main Navigation

Egypt - National Railways Restructuring Project : Resettlement Plan : تفاصيل الوثيقة - مصر - مشروع إعادة الهيكلة الوطنية للسكك الحديدية : خطة إعادة التوطين: تقرير العناية الواجبة بشأن الأراضي لماتاي (SER-9) (Árabe)

The development objective of the National Railways Restructuring Project (ENRRP) for Egypt is to improve the reliability, efficiency, and safety of the railways’ services on targeted sections of the rail network. Some of the negative impacts and mitigation measures include: (1) General Department of Environment (GDE) communicated with ENR property department in Minia and confirmed on the necessity of engaging with the farmers, mitigating the impacts...
Exibir mais

Document also available in : Inglês

DETALHES

  • 2022/06/01

  • Plano de reassentamento

  • 158116

  • 1

  • 1

  • Arab Republic of, Egito, República Árabe do,

  • Oriente Médio e Norte da África,

  • 2022/06/01

  • Disclosed

  • تفاصيل الوثيقة - مصر - مشروع إعادة الهيكلة الوطنية للسكك الحديدية : خطة إعادة التوطين: تقرير العناية الواجبة بشأن الأراضي لماتاي (SER-9)

DOWNLOADS

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

This document is being processed or is not available.