Skip to Main Navigation

Botswana - Emergency Water Security and Efficiency Project : Environmental Assessment (Vol. 5 of 6) : Revised Environmental and Social Management Plan for the Accommodation Camp for Staff at the Contractor’s Construction Camp in Mmadinare (Inglês)

The development objective of the Emergency Water Security and Efficiency Project is to improve operational performance of the Mambo Wastewater Treatment Plant (WWTP) and limit pollution of downstream water sources. Some of the negative impacts and mitigation measures are include : (i) povide for required onsite and offsite training for various WUC personnel to enable independent operation of Mambo WWTP beyond contract operation period. Training to...
Exibir mais

DETALHES

  • 2022/08/31

  • Avaliação Ambiental

  • SFG3031

  • 5

  • 6 (Ver todos os volumes)

  • Botsuana,

  • Eastern and Southern Africa,

  • 2022/10/18

  • Disclosed

  • Revised Environmental and Social Management Plan for the Accommodation Camp for Staff at the Contractor’s Construction Camp in Mmadinare

DOWNLOADS

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

This document is being processed or is not available.