In 2010, Tanzania was classified as a low-income country with high population and economic growth rates that resulted in steadily increasing demand for electricity. Load shedding and unplanned outages were common because of insufficient electricity generation and the overloaded electricity transmission and distribution networks. Load shedding and unplanned outages were common because of insufficient electricity generation and the overloaded electricity...
Exibir mais
DETALHES
-
2024/06/18
-
Relatório sobre Avaliação do Desempenho do Projeto
-
185410
-
1
-
2024/07/11
-
Disclosed
-
Tanzania - Backbone Transmission Investment Project
DOWNLOADS
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
-
Total Downloads** : 717
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.