Detalhes
-
Data do documento
2011/02/14
-
TIpo de documento
Documento de informações do projeto
-
No. do relatório
AB6275
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2011/03/09
-
Disclosure Status
Disclosed
-
Nome do documento
Burundi - Additional Financing for the Road Sector Development Project
-
Palavras-chave
community development associations;Environmental and Social Impact;road sector;displacement of persons;road strategy;destruction of vegetation;social and environmental;domestic air transport;cost of maintenance;road maintenance;Safeguard Policies;Transport Systems;safeguard policy;institutional strengthening;transportation solution;land acquisition;paved road;earth road;road transport;civil works;transport solution;road link;field visits;participatory approach;traditional leaders;opinion leaders;road width;environmental risk;land holder;Armed Conflict;road alignment;civil society;road infrastructure;beneficiary assessment;arable land;financing source;soil erosion;public consultation;organic waste;disbursement arrangement;fund resources;unpaved road;railway system;primary road;regional dimension;transport problem;Rural Poor;drainage improvement;routine maintenance;data management;social accountability;contract execution;oversight function;highway engineer;road agency;work contracts;lake tanganyika;road work;internal fund;heavy rain;International Trade;independent audit;domestic transport;high transport;agricultural economy;fuel levy;performance agreement;transport cost;good governance;water point;financing agreement;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.