The main items in the project are: (a) construction of the first stage of a hydroelectric power complex at Kidatu on the Great Ruaha River, including a dam creating a reservoir and an under-ground generating station with a capacity of 100 MW and with provision for the addition of two more 50 MW units when required; (b) extension by about 15 MW of an existing diesel generating station at Ubungo, near Dar es Salaam, to provide additional power needed before the commissioning of the Kidatu Project; (c) construction of a single circuit 220 KV transmission line from Kidatu to Ubungo and related step-down substation at Ubungo; and (d) consulting services required for implementing the project and to study and make recommendations for dealing with the ecological effects of the project and subsequent stages of development.
Detalhes
-
Data do documento
1970/10/31
-
TIpo de documento
Relatório sobre Avaliação do Pessoal
-
No. do relatório
PU48
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Tanzania - Kidatu Hydroelectric Project
-
Palavras-chave
conditions for bank loan;coastal system;incremental rate of return;preparation of bidding documents;Operational Core Curriculum;fixed asset;Fixed Assets;public supply of electricity;short period of time;electric supply company;demand for power;internal cash generation;long-term debt;kv transmission line;foreign exchange requirement;interest during construction;power station;shortage of funds;power system;civil engineering;maximum rate;cost of capital;discounted cash flow;residual fuel oil;high growth rate;availability of water;deferred income tax;long term planning;price of oil;debt limitation covenant;bill of exchange;technical assistance program;alternative power source;transmission and distribution;sale of electricity;financing plan;Financing plans;load growth;hydroelectric station;distribution facility;high capital;electricity sale;income statement;civil works;maximum demand;hydroelectric development;storage capacity;hydro development;running cost;diesel stations;government approval;hydro scheme;urban population;depreciation charge;generating capacity;total borrowing;hydroelectric site;price level;construction period;discount rate;electrical energy;coastal region;future debt;interest charge;hydro capacity;grace period;Power Generation;Hydro Power;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.