Skip to Main Navigation

Stakeholder Engagement Plan (SEP) - Railway Improvement and Safety for Egypt - P175137 (Inglês)

Detalhes

  • Autor

    Borrowing Agency

  • Data do documento

    2020/12/22

  • TIpo de documento

    Stakeholder Engagement Plan

  • Nº do volume

    1

  • País

    Egito, República Árabe do

  • Região

    Oriente Médio e Norte da África,

  • Data de divulgação

    2020/12/22

  • Disclosure Status

    Disclosed

  • Nome do documento

    Stakeholder Engagement Plan (SEP) - Railway Improvement and Safety for Egypt - P175137

  • Palavras-chave

    public consultation; central traffic control; Environmental and Social Impact Assessment; Environmental and Social Management Framework; stakeholder engagement; community health and safety; environmental and social assessments; small groups of household; traditional means of communication; consultation activity; climate change mitigation; person with disability; people with disability; project affected persons; means of transportation; social and environmental; consultations with stakeholders; capacity building need; improved communication; rehabilitation of road; code of conduct; citizen satisfaction survey; participation of stakeholder; lack of facilities; construction site; grievance mechanism; Child care; train station; vulnerable group; railway corridor; railway line; construction work; land issue; radio program; railway track; railway network; focus group; public place; urban cities; site visits; social media; employment opportunities; stakeholder identification; employment opportunity; mitigation measure; agricultural land; land take; awareness campaign; corrective action; national railway; positive impact; civil works; child labor; personal safety; awareness raising; safety performance; train driver; safe asset; operational efficiency; project approval; reference source; rail corridor; public policy; land property; agricultural directorate; rural settlement; job opportunity; land acquisition; Land Registry; train track; job opportunities; rail station; consulting engineer; railway safety; geographic scope; land area; safety measure; female participation; informant interviews; land usage; resettlement process; local resident; fuel use; technical expert; Train Line; household level; rural area; remote village; several times; national stakeholder; social concern; impact analysis; storage area; project construction; affected communities; major hazard; traffic bottleneck; dense population; land use; construction contractor; railway service; coffee shops; satisfactory manner; video conference; shop owner; field observation; wait area; fruit tree; business opportunity; local contractor; socioeconomic impact; land plot; rent payment; collected data; social distance; local area; two-way communication; agricultural crop; long hour; road cutting; road work; international cooperation; bulletin board; government sector; smaller number; street vendor; safety program; private company; land transport; local entities; management function; precautionary approach; power supply; construction material; social standard; potential tenderers; field visits; non-governmental organization; civil society; public domain; good information; community construction; access road; building ventilation; rail operation; physical location; commercial activity; surrounding community; local control; stakeholder analysis; waste generation; safe crossing; temporary labor; future study; adequate training; community engagement

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • DOCX
  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.