Detalhes
-
Autor
-
Data do documento
2020/10/29
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR43800
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/10/29
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - PK Sindh Water Sector Improvement Project Phase I - P084302 - Sequence No : 26
-
Palavras-chave
irrigation or drainage; Investment Project Financing; Environmental Management Plan; exchange rate fluctuation; Participatory Irrigation Management; water distribution; irrigation system; irrigation water; storm drainage; water global; adaptive response; legal framework; institutional assessment; civil works; procurement efficiency; water resource; irrigated area; agricultural production; improved water; operation risk; risk category; conveyance efficiency; water course; Water Policy; long-term sustainability; sample survey; hydraulic infrastructure; irrigation practices
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.